Line Blinding with a SchuF Cam-Set
Line blinding is now safe and fast
Think of a figure – what is an hour worth to your company?
Per man-hour/per hour of production.
Do you have that figure in mind?
If you could carry out necessary/statutory maintenance on your line and save 93% of the man-hours and lost production in a single element of that process – would you think it was worth a discussion?
Traditional Solid Plate Line Blinding of a 14 to 24 inch pipeline takes 4 to 12 hours using 6 maintenance engineers.
Up to 72 man-hours/72 hours lost production.



-
No special tools or cranes required
-
Time to change – 60 seconds or less
-
One side one man operation
-
Open/close visual indication
-
Positive isolation
-
Counterweight for large blinds
-
Typical sizes – 1″ to 48″
-
Body and seal material options available

Line Blinding with a SchuF Cam-Set takes one engineer less than 5 minutes.
Cost to one side – the SchuF Cam-Set makes Line Blinding a lot safer.
What was that figure you had in mind?
Get in touch for more information or to enquire about the SchuF Cam-Set Line Blind.